From Ottsville to JFK. ✈️
Last month, M&W Precast delivered and installed two precast structures at JFK Airport’s Terminal 6. A Surge Suppressor Room and a South Hardstand Area structure..
From our yard to the runway, M&W's projects have officially landed at JFK.
Surge Suppressor Room 2: Terminal 6
Three-sided structure measuring 11’ long x 6’-6” wide x 10’-7” ceiling height.
Project Team:
GC: Peter Scalamandre & Sons, Inc.
Engineer: AECOM
Owner: Port Authority of New York & New Jersey
South Hardstand Area: Terminal 6
20’ x 24’ x 10’ ceiling structure with 8” thick, non-insulated walls.
Project Team:
GC: Tully Construction
Owner/Engineer: Port Authority of New York & New Jersey